Tank Roof Refurbishment – Fall Protection & Access Systems
Fabrication of galvanised handrails, cage ladder and access platform to improve working at heights safety.
Crane Grillage – Hurstville (27 Tonnes)
Supply of custom fabricated welded beams 2000WB754 and 1500WB477, assembly and trial fitment for Hurstville project crane grillage.
Scrubber Unit Support Structure
Supply, fabrication, and modular lifting of a three-tier scrubber structure to enable safer, more efficient welding at height.
Crane Grillage – Novus Parramatta (12.5 Tonnes)
Supply of custom fabricated welded beams 1200WC 455kg, assembly and trial fitment, painting for Novus Parramatta project crane grillage.
Greater Western Water (VIC) Wind Girder Staging Assemblies
Enhancing Water Security in Melbourne’s Outer West
Crane Grillages – ANZ Building Sydney – 2 Units (42 Tonnes)
Supply and fabrication of two 20-tonne crane grillages using custom 1200WB278 welded beams, including trial assembly, abrasive blasting and protective coatings for the ANZ Building tower crane installation.
Bulk Storage Stiffening Rings (SA) – Tank Structures
Fabrication, section rolling and welding of three sets of stiffening rings for 10 megalitre bulk water storage tanks located at Bald Hill, South Australia.
Tower Crane Mast Section Refurbishments – Terex Comedil HD23
Sutton Engineering Group completed the refurbishment of two 6-metre Terex Comedil HD23 tower crane mast sections for a major tower crane company in NSW.
Concrete Kibble & Jaw Set – Design, Fabrication & Ongoing Refurbishment
Design, fabrication and ongoing refurbishment of a custom concrete kibble and jaw set.